I’ve been at a conference all week. It’s wreaking havoc with my schedule, but I have gotten a lot of knitting done:
That’s an almost complete pair of toddler socks. An almost complete boot topper design. And an almost complete toddler sweater. Notice the “almost complete” everything needs ends woven in and a good round of blocking. The toddler sweater still needs one quarter more cable edging knit. I love cables and I’m still so done with this edging…
The socks are just scrappy little things that have been my glove-box project for months now. They’ve actually been in progress so long that her feet grew. I made the second one with a longer foot than the first, then ripped out the toe on the original and made it to match.
The boot toppers are a quick knit using up some leftover Fleece Artist BFL that I adore. This pattern will (with any luck) be out in the fall. I need some photography. And some layout time. Oh yeah, right, that…
And the sweater is Camden. Poor, long neglected Camden is almost done! Pretty sure I’m knitting the 2T size – and also pretty sure it’s bigger than all the 2T clothes she owns so far. It’ll actually be perfect for growing into this winter.